Location

Comstock Memorial Union, MSUM

Document Type

Poster

Event Website

https://www.mnstate.edu/sac/

Start Date

18-4-2023 12:00 AM

Publication Date

April 2023

Description

Before the upgrade to the dome and telescope, much of the work to use the telescope was done manually. One had to drive an hour round trip to the observatory at dusk and dawn to ensure that the telescope started up and shutdown properly. Proper startup included manually opening the lower dome flap via hand crank and briefly plugging in the top part of the dome to raise the upper slit. Shutting down the telescope during the summer required a person to be at the telescope by 5:00AM, before sunrise to make sure that the dome closed before the sun rose. Normally this prep work would take about 2 hours including driving time.

Share

COinS
 
Apr 18th, 12:00 AM

Paul Feder Observatory Upgrades and Exoplanet and Variable Star Data

Comstock Memorial Union, MSUM

Before the upgrade to the dome and telescope, much of the work to use the telescope was done manually. One had to drive an hour round trip to the observatory at dusk and dawn to ensure that the telescope started up and shutdown properly. Proper startup included manually opening the lower dome flap via hand crank and briefly plugging in the top part of the dome to raise the upper slit. Shutting down the telescope during the summer required a person to be at the telescope by 5:00AM, before sunrise to make sure that the dome closed before the sun rose. Normally this prep work would take about 2 hours including driving time.

https://red.mnstate.edu/sac/2023/cshe/5

 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.